Post Image

200,000,000.00

Category:

Description

350,000 MT Waste processing capability input
300,000 MT Nano Powder output
500MW Electricity output
10.000 m2 Greenhouse for 30.000.000 kg fruits output
1000 MT Fish farming
The Alpha plant require 160.000m2 Land plus infrastructure
Time until production 24 months calculated from the day of construction and trade license delivered and the Franchise requirements completed. The Facility will be delivered by AVIS Engineering
AVIS Global Group will plan, develop pre-fabricate and delivery by AVIS Engineering
The Franchise must provide Land, pre-license and infrastructure for the project at the host location
The facility will be operated by AVIS Engineering together with host subcontractors
Up to1000 new jobs generated

Download: Franchise Contract

Document Upload link to the AVIS Team

You may also like…

Next
VORTEX Mining Unit

This site uses Akismet to reduce spam. Learn how your comment data is processed.